石油科技论坛 ›› 2013, Vol. 32 ›› Issue (3): 15-20, 66.DOI: 10.3969/j.issn.1002-302x.2013.03.004

• 技术创新 • 上一篇    下一篇

大情字井油田地面建设工艺技术创新与实践

王树臣   

  1. 中国石油吉林油田公司基建工程处
  • 出版日期:2015-04-24 发布日期:2015-04-25

Creation and Practice of Surface Construction Process Technology at Daqingzijing Oilfield

Wang Shuchen   

  • Online:2015-04-24 Published:2015-04-25

摘要: 大情字井油田建成百万吨生产规模,是吉林油田增储上产的主力区块。地面产能建设工程根据油藏深、区块分散、多油层叠合滚动开发、快速开发等特点,运用系统综合优化技术,推广成熟技术,吸收利用实用技术,进行了工艺技术创新。应用了多井串接环状掺水密闭集输技术、软件量油技术、先进的超声波液位控制技术等15项新技术;采用了新型复合极板电脱水器、伴生气自然冷却除油装置、高压玻璃钢管材、高效真空加热炉4项新设备、新材料;实现了总体布局、站内平面、设备结构"三个优化",集油方式、计量方式、分离及脱水工艺"三个简化",自动化水平、注入水水质、污水处理效果"三个提高",达到"站外无人值守"、"接转站、联合站全密闭"的新目标。经过几年生产运行,实现了各项技术指标全面达标的高效开发,地面建设整体水平达到新的高度。

关键词: 大情字井油田, 地面工艺, 技术创新

Abstract: DaqingzijingOilfield, withan annual productioncapacity of 1 million tons,has becomethemain block forJilin OilField toincrease its reservesand production. The surface productivity construction engineering is based on a number of characteristics, such as deep oil reservoir, scattered blocks, progressive development of overlapped oil layers, and rapid development. The oilfield has adopted integrated optimization technology, extended mature technology and made use of applicable technology for creation of process technology. A series of 15 new technologies are put into use, such as the technology to connect wells in parallel for closed gathering and transfer with water injection, the software oil measurement technology and the advanced ultrasonic liquid-level control technology. Four items of new equipment and new materials are used -- the new-type compound polar plate electric dewatering unit, the associated gas natural-cooling oil-removing unit, the high-pressure glass steel tubular, and the high-effective vacuum heater. The general layout, the plane of station and the equipment structure are optimized while the gathering and transfer way, the measurement way and the separating and dewatering process are simplified with the automatic level, the quality of injected water and the results of sewage treatment improved. The new target for transfer stations and gathering stations under fully-closed management is fulfilled at the same time. Based on production and operation of some years, all the technological indexes fully reached the requirements for high-effective development while surface construction also hit a new record high.

Key words: Daqingzijing Oilfield; surface process;technological creation

中图分类号: