石油科技论坛 ›› 2016, Vol. 35 ›› Issue (2): 12-17.DOI: 10.3969/j.issn.1002-302x.2016.02.003

• 科技管理 • 上一篇    下一篇

创新技术、体制、机制实现沙漠油田高效开发——以塔中400×104t 产能建设总包项目为例

王安平 侯亚东 刘德伦 祝林权 张德碧 彭景云   

  1. 中国石油集团川庆钻探工程有限公司地质勘探开发研究院
  • 出版日期:2016-04-25 发布日期:2016-06-08
  • 基金资助:
    中国石油集团川庆钻探工程有限公司地质勘探开发研究院2016 年科研项目“塔中EPCC 油气产能建设区块总包‘主 导型’项目管理研究”。

Innovate Technology, Structuring and Mechanism; Bring Desert Oilfield under Effective Development ---Taking general contract of Tazhong 400?04t productivity construction project for instance

Wang Anping, Hou Yadong, Liu Delun, Zhu Linquan, Zhang Debi, Peng Jingyun   

  1. Geological Exploration and Development Research Institute of CNPC Chuanqing Drilling Engineering Co Ltd, Chengdu 610051, China
  • Online:2016-04-25 Published:2016-06-08
  • Supported by:
     

摘要: 塔中400×104t 产能建设项目是目前我国油气勘探开发规模最大的EPCC 总承包工程项目。为高效完成建 设任务,实现创新管理+ 质量效益型的发展之路,中国石油塔里木油田公司与川庆钻探公司创新合作机制,打造精干 高效的管理体系,科学应用塔中碳酸盐岩油气藏高效开发实践中提出的“筋脉”理论,突破地质认识,科学部署钻探井位, 运用新技术攻克钻探及地面建设难题。在塔中区块着力实施“横向扩边、纵向扩层”的勘探部署,滚动推进油气勘探开发。 通过地质工程一体化、地面地下一体化、甲方乙方一体化,勘探取得重大突破,钻井成功率高达94.8%,新增勘探开发 面积536.9km2,新申报预测储量4105×104t,创造了近30 亿元的勘探投资效益。项目历经3 年,如期建成具有国内地 面建设一流水平的400×104t 油气处理厂,为塔里木油田増储上产和建设“新疆大庆”做出了贡献。

 

关键词: 产能建设, 总承包工程, 项目管理, 体制机制, 勘探开发, 工程技术, 塔中油田

Abstract: The Tazhong 400×104t productivity construction project is the largest EPCC engineering contract project in China’s oil and gas exploration and development at the present time. In the efforts to construct the productive in high efficiency and pursue creative management, high quality and good economic performance for development, PetroChina Tarim Oilfield Company and CNPC Chuanqing Drilling Engineering Co Ltd have created the cooperative mechanism, established the high-efficiency management system and made scientific use of the theory of “channels” proposed in the practice of effective development of carbonate rock oil and gas reservoirs in the Tazhong area. With the breakthroughs made in geological knowledge and positions of exploration wells scientifically deployed, the bottlenecks in drilling and surface construction have been solved by means of new technologies. Exploration is unfolded in the Tazhong block under the principle of “horizontally enlarging boundaries and vertically increasing horizons”, making continual progress in oil and gas exploration and development. Based on integration of geological engineering, integration of surface and underground and integration between Party A and Party B, significant breakthroughs have been made in exploration with the drilling success rate reaching as high as 94.8 percent. The newly additional exploration and development areas were 536.9 square kilometers while the newly submitted predicted reserves were 4105×104t, generating a turnover of 3 billion yuan for exploration investment. The project experienced over a period of three years. A 400×104t oil and gas treatment plant, which is the firstclass one in China in terms of surface construction, was built as scheduled. The project has made contributions in the efforts to increase reserves and production in Tarim Oilfield and construct “another Daqing” in Xinjiang.

中图分类号: