[1] |
Si Guang, Liu Wentao, Ding Danhong, Zhang Yunyi, Jiang Xuemei, Yuan Chunhua, Ji Wenzhen.
Research and Practice from Using Target Cost Control Method for Detailed Management of Well Engineering Projects
[J]. Petroleum Science and Technology Forum, 2021, 40(5): 34-42.
|
[2] |
Hu Gui, Cui Mingyue, Tao Ye, Huang Xueqin, Zhang Guohui, Shi Libao.
Progress in Oil and Gas Wellbore Engineering Data Platform Technology and Suggestions on In-depth Application of Data
[J]. Petroleum Science and Technology Forum, 2021, 40(5): 65-72.
|
[3] |
Su Yinao.
Inspiration from Establishment, Development and Innovation of Downhole Control Engineering
[J]. Petroleum Science and Technology Forum, 2019, 38(5): 1-7.
|
[4] |
Dong Shengwei, Jin Gentai, Shen Ruichen, Xia Yan, Li Jingcui.
DRGLI-1-Airtight Inspecting Equipment for Tubing-casing Thread Connection
[J]. Petroleum Science and Technology Forum, 2017, 36(增刊): 51-52.
|
[5] |
Qi Fengzhong, Yu Yongjin, Liu Binhui, Han Qing.
Study and Practice of Large Temperature Difference Cementing Technology for Long-cementing Interval
[J]. Petroleum Science and Technology Forum, 2017, 36(6): 32-36.
|
[6] |
Hu Qiangfa, Fu Yue, Gai Zhiliang, Xu Yunxi, Liu Shoujun, Tan Duohong, Jia Xia.
Research and Application of Coiled Tubing Service Technology and Equipment
[J]. Petroleum Science and Technology Forum, 2017, 36(5): 7-11.
|
[7] |
Hu Qiangfa, Zhang Youjun, Lu Yansen, Chen Zhi, Wan Youyu, Chen Kehua, Zhang Yan.
Pilot Experiment of Coiled Tubing Spraying Flow Radial Drilling Technology and Suggestions on Its Wide Application
[J]. Petroleum Science and Technology Forum, 2017, 36(5): 60-67.
|
[8] |
Qi Fengzhong, Liu Shuoqiong, Shen Jieyun.
Suggestions on CNPC Cementing Technological Development
[J]. Petroleum Science and Technology Forum, 2017, 36(1): 26-31.
|
[9] |
Li Xuri, Tian Wei, Fu Gangdan, Liu Shuangquan, Li Yaode, Han Qianghui.
Metalloid-integrated Plunger Gas-lift Drainage Gas Recovery Technology
[J]. Petroleum Science and Technology Forum, 2016, 35(增刊): 115-118.
|
[10] |
Li Yuan, Wang Jingxin.
Well Integrated Monitoring and Control Cabinet
[J]. Petroleum Science and Technology Forum, 2015, 34(增刊): 107-109.
|
[11] |
Sun Haifang, Xie Zhengkai, Li Jie, Zhou Yingchao, Song Zhoucheng and Feng Jinghai.
Field Test of Managed Pressure Drilling Technology and Equipment
[J]. Petroleum Science and Technology Forum, 2015, 34(1): 14-17.
|
[12] |
Zhang Jianjun, Shi Junfeng and Zhao Ruidong.
Optimized Design of Oil and Gas Well Production System and Diagnostic and Decision-Making Software (PetroPE) V1.0
[J]. Petroleum Science and Technology Forum, 2013, 32(5): 55-57.
|
[13] |
Qi Fengzhong, Liu Shuoqiong, Shen Jiyun and Liu Zishuai.
Problems Facing CNPC Well Cementing Technological Development
[J]. Petroleum Science and Technology Forum, 2013, 32(4): 5-8, 69.
|
[14] |
Wang Minsheng and Li Jing.
Analysis of Downhole Measurement Control Technology Patent of Oil and Gas Wells
[J]. Petroleum Science and Technology Forum, 2013, 32(4): 14-18, 21,69,70.
|
[15] |
Qi Fengzhong, Yang Chengjie and Liu Zishuai.
Improve Cementing Quality of Complicated Oil and Gas Wells-Ensure Long-Term Sealing Performance of Cement Sheath
[J]. Petroleum Science and Technology Forum, 2013, 32(1): 19-22, 66,67.
|